Sign In | Join Free | My spintoband.com
spintoband.com
Hitop industrial (HK) co., Ltd
Cooperation Integrity Innovation Gratitude To create the future for employees! To create the value for customers!
Home >

Hitop industrial (HK) co., Ltd Quality Info

Hitop industrial (HK) co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Hitop industrial (HK) co., Ltd

 

 

 

With the help of CMM, projector,  and some other measuring tools and equipments and team members conscientiousness,we can guarantee the mold quality by inspecting in-coming material ,manufacturing process and samples.

Our main QC Process are as follows :
1.Customer’s Mold Specification Sheet Check 
2.Mold Design Control 
3.Mold Steel Hardness Inspection
4.Mold Electrodes Inspection
5.Mold Core and Cavity Steel Dimension Inspection
6.Mold Pre-Assembly Inspection 
7.Mold Trial Report and Samples Inspection 
8.Final Full Inspection prior to shipment 
9.Mold Package Inspection

 

 

1. Well mold design is half of success . Our engineering department have 25 experienced mold designers utilizing the latest design software such as

 

 

2D drawing : Auto CAD , E –drawing

3D drawing : Pro-E ,UG, Solidworks (wildfire version) ,Mastercam

Mold Flow Analysis

 

 

2. We have a Project Management team to follow up the mold making :

Time Schedule: We will provide the time schedule every week to report the mold progress.

Dimensions report: Dimensions report will be submitted to customer together with the trial samples.

Heat Treatment and Steel Certificate

 

 

 

 

 

Company Certifications

Standard:ISO9001: 2008
Number: 40504
Issued By:UKAS
Standard:ISO14001:2004
Number: 016ZB14E20849R2M
Issued By:CNAS
Standard:OHSAS18001: 2007
Number: H2438
Issued By:UKAS
Standard:ISO/TS16949: 2009
Number: T1477
Issued By:IATF
Send your message to this supplier
 
From:
Enter your email please.
To: Hitop industrial (HK) co., Ltd
Subject:
Message:
Characters Remaining: (0/3000)